(678) 555-0117
Projects

Finished jobs, and how close we came.

Every project below shows the time it took and what happened to the budget.

94%of jobs finish on the estimated price or under
340jobs finished since we opened
3 daysaverage schedule slip across the last fifty jobs
Kitchen with walnut shelving and a dark island
Kitchen, nine weeks

The Dunwoody kitchen

Took out one wall and a soffit. The final bill landed $640 under the estimate.

Bathroom with a glass shower and warm stone
Bathroom, five weeks

The Suwanee primary bath

A tub nobody used became a walk-in shower with a bench and a window.

Walk-in closet with lit wood shelving
Closet, three weeks

The Alpharetta closet

A spare bedroom turned into a dressing room with lit oak shelving.

Warm taupe kitchen with an island and stools
Whole floor, fourteen weeks

The Duluth main floor

Kitchen, dining, and floors, done in two phases while the family stayed home.

Bathroom with dark stone and a round mirror
Bathroom, two weeks

The Johns Creek powder room

Small room, big stone, and a mirror that took three tries to find.

Bring us the room that bothers you most.

Free in-home estimate, usually within the week.